In handling a project, PT. ST has a standard procedure subdivided in stages as described below. Established a design team which headed by a Project Director (PD) who responsible for the whole project.
PD will prepare a Project Implementation Plan (PIP) describes the project including scope of work, scope of services, schedule, team and budget.
The Project Director will be assisted by a Project Coordinator(s). The Project Coordinator (PC) is responsible for coordination of a design team, which consists of engineers of each discipline electrical, electronics, ventilation and air conditioning, hydraulic, fire fighting and vertical transportation and moving walk system and daily activities to meet the requirement of project.
Standards and references, which we referred to, are from Jakarta Authorities, Public Works Department, NFPA (USA) and Australian Standards (AS).
ST always prepares a “tailor-made specification”, dedicated to the relevant project.
The scope of building survey is as follows:
Ventilation & Air Conditioning
Fire fighting
Hydraulic hot water and steam generating systems
Hydraulic cold water system
Hydraulic waste water system
Hydraulic rain water discharge
Medical gas
Kitchen and laundry installation
Vertical transportation & moving walk systems
Medium & low voltage power supply
Emergency power supply
Distribution system
Lighting system
Lightning protection
Fire alarm system
Communication system
Sound system
Master antenna television system
Close circuit television system
Security system
Building automation system